 |
 |
|
|
|
|
|
|
|
|
|
![]() |

Subscribe
to our Newsletter to get regular news & updates.
|
|
12 Jul 2010
Today, it was announced that the Al Fara’a Integrated Construction Group has achieved seve...
|
|
07 Jul 2010
AL FARA’A INTEGRATED CONSTRUCTION GROUP CELEBRATES 30TH BIRTHDAY
|
|
 |
|
|
|
|
| |
|
Home Oil and Gas |
Oil and gas
We have successfully completed the installation of a 2.7 km George Fisher PVC containment piping system at Dubai International Airport from bulk LPG storage tanks to the terminal service point. This consisted of the piping system, protected with a multi-channel gas sampling system. Other projects include the LPG system at the Royal Meridien, Abu Dhabi, consisting of storage tanks, controlled gas supply pipe-in-pipe PVC containment, multi-channel gas detection panels and sprinkler systems. Our installation at the Emirates Towers Hotel, in Dubai, supplies central LPG at 14 million btu/hour. At Emirates Palace Hotel, in Abu Dhabi, we designed and built a bulk fuel handling system. |
|
|
|
|
|
|
|